Help - Search - Members - Calendar
Full Version: Go Around On Msp Ua A319
Flightlevel350.com Forums > FL350 Forum > Civil Aviation
Chrome777
Yesterday at about 3:00-5PM i was out on MSP with my two friends and i saw this UA A319 that was on approach and then it just aborted landing. A second try was done but ended up being on another aborted landing.

I have been looking around to see what append but i don't know of any ways possible to find information can someone please help me out?
galaxy
He(she) didn't understand this " Approach briefing " on that flight training. icon_rolleyes.gif
Fast Jet
QUOTE(Chrome777 @ Aug 9 2010, 09:56 PM) *
Yesterday at about 3:00-5PM i was out on MSP with my two friends and i saw this UA A319 that was on approach and then it just aborted landing. A second try was done but ended up being on another aborted landing.

I have been looking around to see what append but i don't know of any ways possible to find information can someone please help me out?



Easy, they were training. Practising go arounds - they have to be practised you know, both in the sim and in the air.

Hope this helps.
27driver
I doubt it was training. Cash strapped airliners don't take their desperately needed assets out of revenue service to do go arounds in a congested airport like MSP. That's what simulators are for.

In MSP, it could have been anything from the approach not stabilized, a fouled runway, FOD from a birdstrike, ECAM failure, aircraft not clearing the runway (likely, as tight as the controllers like to bring planes into MSP), or any number of things that caused either the PIC or the controller to call for a go-around.
Fast Jet
QUOTE(27driver @ Sep 11 2010, 05:19 AM) *
I doubt it was training. Cash strapped airliners don't take their desperately needed assets out of revenue service to do go arounds in a congested airport like MSP. That's what simulators are for.

In MSP, it could have been anything from the approach not stabilized, a fouled runway, FOD from a birdstrike, ECAM failure, aircraft not clearing the runway (likely, as tight as the controllers like to bring planes into MSP), or any number of things that caused either the PIC or the controller to call for a go-around.


What about base training - it could have been that. . . could it not. . ? But, it was two go arounds.
This is a "lo-fi" version of our main content. To view the full version with more information, formatting and images, please click here.
Invision Power Board © 2001-2013 Invision Power Services, Inc.